Scenario As most IT professionals I usually configure network devices in a lab environment before the actual installation at customer site.
I try to limit the installation as much as possible to a simple box moving process, spending most of the change window in a previously defined validation process.
In this particular case I deal with a data center core network that includes 8 Nexus 9k switches configured in 4 VPC pairs and a bunch of links between them.